Nansana Business Centre, Hoima Road 0774 012 225 0702 008 906 info@superbislimited.com
Room renovation in progress with ladder and materials

House Renovation Contractors in Kampala

As house renovation contractors in Kampala, we upgrade, extend and transform existing buildings, checking the structure first and finishing properly.

Renovations and extensions that add real value

Super Bis Limited works as house renovation contractors in Kampala for homeowners, landlords, schools and religious institutions. Our renovation and alteration consultancy covers everything from a tired kitchen to the modification of a whole building, as we did for Tawhiid Mosque on Mwanga II Road in Kampala.

Renovation is different from new construction: you are working with an existing structure, existing services and often people still using the building. We begin with a building condition assessment, so we know what can stay, what must be repaired and what can safely be changed.

Finished modern bathroom with tiles, glass shower and double sink

Renovation services

  • Kitchen and bathroom remodelling
  • Room extensions and additional storeys
  • Structural alterations: new openings, removed walls, strengthening
  • Roof replacement and roof repairs
  • Re-plastering, new floors, tiling and ceilings
  • Rewiring and replumbing
  • Facade upgrades, new windows and repainting

How we manage a renovation

  1. Condition surveyWe inspect the structure, roof, services and finishes, and note what needs attention.
  2. Design and approvalsOur architect prepares drawings for alterations or extensions and supports approvals.
  3. Phased worksWe plan the work in phases to protect occupied areas and control dust and noise.
  4. Finish and hand overNew finishes are matched to the existing building, then we clean up and hand over.

For larger alterations, our building plans team prepares the drawings, and our construction supervisors manage the works.

Renovation ideas that pay off

Rental upgrades

New kitchens, bathrooms, tiles and paint help landlords attract better tenants. Our property management service can then look after the units.

Growing families

Extra bedrooms, a second floor or a boys’ quarters extension can be cheaper than buying a new house.

Institutions

Schools, churches and mosques can be extended and modernised in phases while they stay open.

House floor plan blueprint showing rooms and dimensions

Renovation finishes are carried out by our finishing works and painting teams, as part of our full construction services.

What affects the cost of a renovation

  • Condition of the building: hidden problems such as cracks, damp or termite damage must be fixed first.
  • Structural work: extensions and new openings need engineering design and more materials.
  • Services: rewiring and replumbing add cost but prevent problems later.
  • Finishes: tiles, fittings and cabinetry range from budget to premium.

We price renovations room by room, so you can do the most important work first and the rest later. We renovate buildings in Kampala, Wakiso, Nansana, Mukono and other areas.

Renovation FAQs

Can you add a floor to my existing house?

Possibly. Adding a storey depends on whether the existing foundations, columns and walls can carry the extra load. Our civil engineer assesses the structure first, and we only proceed if it is safe or can be strengthened.

Do I need approval for a renovation or extension?

Extensions and structural alterations normally need approved plans from the local authority. Internal upgrades such as new finishes usually do not. We advise you on what applies to your project.

Can we stay in the house during the renovation?

Often yes. We plan the work in sections, keep the site safe and tidy, and schedule noisy or dusty work to limit disruption.

Ready to renovate or extend?

Send us photos of the building and tell us what you would like to change. We will arrange an assessment and quotation.

WhatsApp